Tuesday June 14, 2022 brings with it a full moon!
Full of energies for positive transformation,
This week started off great for Triforce |Painting Solutions.
We have a full work week ahead,
started off on Monday June 13 a little out of usual labor for us
I went to install a 2 post retaining wall on a front yard to a house in Garland Texas
Put down a total of about 16 8ft long fence posts along the perimeter of the yard.
The job was heavy and intense in labor, because I had to dig a small trench of about 5inches so I could set the bottom base post into the ground.
Overall the project went well and Home owner was very satisfied with the way it turned out.
Time to complete project was 4 hours.
The reason homeowner wanted this retaining wall is because whenever it rains, he said his grass and yard mud would all drain away towards the sidewalk and street, leaving his yard looking as if a mini landslide had happened on his yard.
By adding the 2post retaining wall to his front yard perimeter, that problem of his grass and dirt washing away should be solved.
Thanks for reading!